Example of method 3 "Retrieving fuel debris from the side”
Index
> Considerations - 3. Seismic safety|Example of method 3 "Retrieving fuel debris from the side”
ⅱ) Considerations - 3. Seismic safety
Issues to be noted for the proposing method in terms of safety are explained below.
Consideration shall be made for seismic safety and spesific study shall be performed in C/S
Issues requiring special attention 3. Seismic safety
(1) Prior preparation
Seismic assessment when creating opening on the building for investigation and fuel debris retrieval
(2) Install barrier
Seismic assessment of barrier equipment
Seismic capacity of building when installing barrier on the first floor
(3) Create opening on the side of PCV
(4) Install equipment and access
Seismic safety of equipment for fuel debris retrieval
Seismicity of the building where the equipment for retrieval is located on the first floor
(including shielding facilities)
(5) Dismantle and remove internal structures
Seismic assessment of equipment for retrieving fuel debris
Structural stability of internal structures during dismantling of internal structures
(6) Retrieve fuel debris
(7) Transport canister
(8) Clean-up equipment
Plant information
Plain view (Unit 1)
Plain view (Unit 2)
Plain view (Unit 3)
Name of major equipment and areas in reactor building
Assumptions and prerequisites
Allowable load of 1st. floor : 1.2t/㎡
Size of equipment which should be transported through passageway : Width 1.2m, Height 3m or less
Total weight of equipment installed on the operation floor shall be minimized based on seismic safety.
→Application field : Prior preparation|Application field and the issues on "Visual and measurement technology”