Task(s): Method for remove and transfer of equipment for dismantling and transporting.
(8) Clean-up equipment - Major challenges on the actual method
Clean-up equipment method
- Method of dismantling and removing cutting and transferring equipment
- Maintaining boundary after clean-up equipment
Assumptions and prerequisites |
- Allowable load of 1st. floor : 1.2t/㎡
- Size of equipment which should be transported through passageway : Width 1.2m, Height 3m or less
|